
Debra F.
1/12/2018
Tim Moore Construction did a bathroom for us last year (2017). We had our existing bathroom enlarged and also had 2 Windows removed from the den & sliding glass doors installed. They finished the...
(2)
Tim Moore Construction did a bathroom for us last year (2017). We had our existing bathroom enlarged and also had 2 Windows removed from the den & sliding glass doors installed. They finished the...
My father hired them as the renovating company for the building he was remodeling. By far the most unprofessional team we have ever came across. They blackmailed their way through every step and...