Henry M.
11/18/2019
After getting 4-5 estimates and interviewing each contractor, we decided to go with Andy Pitts for this job. While he wasn't the lowest bid, he was one of the lowest. The deciding factor was...
(1)
After getting 4-5 estimates and interviewing each contractor, we decided to go with Andy Pitts for this job. While he wasn't the lowest bid, he was one of the lowest. The deciding factor was...