William K.
9/6/2025
I had estimates from the big high pressure sales companies. The prices were high and the selection was limited. Most did only the tub to shower. We wanted something that was high quality, with the...
(2)
I had estimates from the big high pressure sales companies. The prices were high and the selection was limited. Most did only the tub to shower. We wanted something that was high quality, with the...
Contractor left before finishing job. Took toilet and wood floor trim in main bathroom without replacing such. Damaged wall at bottom near toilet area when removing wood trim molding. Removed door...
Partial Data by Infogroup (c) 2025. All rights reserved.
Partial Data by Foursquare.