William M.
8/19/2020
Let me start by saying the owner was pleasant to deal with. And the end product was descent (at least what was finished). What was not good: It took much longer than the contract stated (8 day per...
(1)
Kitchen, Bath, paint,carpet installation, drywall repair, tile,hardwood floors and Remodeling
Let me start by saying the owner was pleasant to deal with. And the end product was descent (at least what was finished). What was not good: It took much longer than the contract stated (8 day per...