Christopher V.
8/5/2022
I can't say enough good things here. We had a plan to build a 2,565 sf home at Del Webb Nexton. The decision we had was whether to have Pulte do the pre-wiring and transfer switch. So I called...
(2)
I can't say enough good things here. We had a plan to build a 2,565 sf home at Del Webb Nexton. The decision we had was whether to have Pulte do the pre-wiring and transfer switch. So I called...
Signed a contract through Costco to have them install a generator. They had me call the Berkeley Electric coop to schedule a disconnect during the time it would take to do the install with the...