Philly T D.
3/26/2014
Project: Master Bath Renovation The contractor walked away from my project and left me in a lurch... I was working with Monappella Tile to do a complete rip out and remodel of my Master...
(2)
Project: Master Bath Renovation The contractor walked away from my project and left me in a lurch... I was working with Monappella Tile to do a complete rip out and remodel of my Master...
went into the show room and spoke with the wife, I really felt good about the visit she was very helpful. and I even picked out tiles. She said her husband would call me within a week or two BUT...