Doug S.
5/24/2017
Took a long time to start and then a long time to finish the project. Stated 3-6 weeks to begin project which actually began in over 9 weeks. Then there was a delay as not enough supplies were...
(2)
Took a long time to start and then a long time to finish the project. Stated 3-6 weeks to begin project which actually began in over 9 weeks. Then there was a delay as not enough supplies were...
We had Platinum add more insulation in some of the attic areas and blow cellulose into the exterior walls. It took a little longer to complete the job because there was a problem with their...