Critic X.
7/19/2025
We verbally agreed for a civil engineering report for flooring. It was a fixed price "contract". The problem was everything was verbal. I discussed the situation before and offered to send photos...
(1)
We verbally agreed for a civil engineering report for flooring. It was a fixed price "contract". The problem was everything was verbal. I discussed the situation before and offered to send photos...
Partial Data by Infogroup (c) 2025. All rights reserved.
Partial Data by Foursquare.