Karyn P.
4/19/2018
4/12/2015 Rizzo Ahmad, President entered into a $106,812.06 contract, Pointing, Stucco, Brickwork, Roofing with our building. His company has been called more than 30 times to return to repair...
(1)
4/12/2015 Rizzo Ahmad, President entered into a $106,812.06 contract, Pointing, Stucco, Brickwork, Roofing with our building. His company has been called more than 30 times to return to repair...