Alison M.
3/20/2013
A master mechanic was called to the site of a factory because the equipment was malfunctioning. In 10 minutes, he found that a bolt was missing, replaced it, and wrote the name of the part on a...
(2)
A master mechanic was called to the site of a factory because the equipment was malfunctioning. In 10 minutes, he found that a bolt was missing, replaced it, and wrote the name of the part on a...
The worst place you can imagine to have work done for you took almost $800 to change few breakers on the panel. Was very rude to the tenants at house and DID NOT COMPLETE the job tried calling him...
Partial Data by Infogroup (c) 2025. All rights reserved.
Partial Data by Foursquare.