Amberlin R.
8/31/2011
I had to get an as-built done quickly for a foundation in order to obtain a building permit. As luck would have it, we got hit with a hurricane and most people lost power, including the surveyor...
(1)
I had to get an as-built done quickly for a foundation in order to obtain a building permit. As luck would have it, we got hit with a hurricane and most people lost power, including the surveyor...
Partial Data by Infogroup (c) 2025. All rights reserved.
Partial Data by Foursquare.