
Candace H.
4/8/2025
It is undergoing a COMPLETE renovation. And I mean COMPLETE. I believe only the top (3rd) floor is done. There are boxes of cabinetry and sinks and chairs scattered all over the front of the...
(27)
It is undergoing a COMPLETE renovation. And I mean COMPLETE. I believe only the top (3rd) floor is done. There are boxes of cabinetry and sinks and chairs scattered all over the front of the...
The room was clean. The hot water took forever to warm up which wasted many gallons of water. No regular coffee packets were in the room so I called the front desk in the morning for a packet and...
Partial Data by Infogroup (c) 2025. All rights reserved.