
Barbara G.
9/3/2024
Project had to be redone, total of 5 weeks to repair shower drain and redo tile floor of shower. Was told by worker they used wrong materials on tile, so the floor started coming apart after...
(1)
Project had to be redone, total of 5 weeks to repair shower drain and redo tile floor of shower. Was told by worker they used wrong materials on tile, so the floor started coming apart after...