Jonathan M.
10/29/2024
AJ has been very busy over the damage caused by hurricane Milton. Right now we are trying to get a new power pole installed and AJ has been trying to find the correct size pole to have it...
(2)
AJ has been very busy over the damage caused by hurricane Milton. Right now we are trying to get a new power pole installed and AJ has been trying to find the correct size pole to have it...
We contacted them on July 4th we have no electricity and no A/C they said they would show up between 9-10 it's now 1 they don't answer the phone, text or DM. No courtesy to even send a message...