
Stephen H.
10/26/2021
Scope of work includes: Demo a water damaged 2nd floor shared hallway bathroom down to frame Replace floor insulation, subfloor, baseboards, and refinish wall. Install LVT, new prefab acrylic...
(1)
Scope of work includes: Demo a water damaged 2nd floor shared hallway bathroom down to frame Replace floor insulation, subfloor, baseboards, and refinish wall. Install LVT, new prefab acrylic...
Partial Data by Infogroup (c) 2025. All rights reserved.
Partial Data by Foursquare.